Phases of Piling Work

Exterior footing settlement has caused structural movements affecting the home’s drywall, windows and doors, and flooring.

Exterior footing settlement has caused structural movements affecting the home’s drywall, windows and doors, and flooring.

Step 1: The ground area close to the footing is excavated.

Step 2:  Steel pilings are driven to refusal, dispersing the load-bearing capacity of the structure below grade.

 

Step 3: Hydraulic jacks are temporarily used to lift the footing to the desired height.  The piling placement is then shimmed tight to the footing.

 